Knitted Tranquil Lapghan
Step: 1
GETTING STARTED: Download the PDF for a set of portable project instructions. Read through all of the instructions before beginning.
ABBREVIATIONS:
K = knit; P = purl; St st = Stockinette stitch; st(s) = stitch(es); [ ] = work directions in brackets the number of times specified
SIZES:
Afghan is 36" (91cm) X 48" (122 cm)
MATERIALS:
- Yarn: we used Red Heart® Super Saver™ Yarn, available at Walmart: 2 skeins 883 Spa Blue (A), 3 skeins 931 Seagrass (B)
- Boye® 5mm [US 8] circular knitting needle, 36" (91cm) long
See the Supply List for items you can purchase here.
GAUGE:
16 sts = 4" (10cm); 22 rows = 4" (10cm) in Stockinette Stitch. CHECK YOUR GAUGE. Use any size needles to obtain the specified gauge. Note: Afghan is worked back and forth in rows. Circular needle is used to accommodate large number of stitches.
Step: 2
PATTERN STITCH:
Row 1 (Right Side): With A, k2, [p2, k2] across.
Row 2: P2, [k2, p2] across.
Row 3: P2, [k2, p2] across.
Row 4: K2, [p2, k2] across.
Repeat Rows 1-4 for Pattern Stitch.
Step: 3
DIRECTIONS
Lapghan
With A, cast on 130 sts. Work 6 rows in Pattern st.
With B, work 20 rows in St st.
With A, work 10 rows in Pattern st.
With B, work 30 rows in St st.
With A, work 16 rows in Pattern st.
With B, work 50 rows in St st.
With A, work 6 rows in Pattern st.
With B, work 50 rows in St st.
With A, work 16 rows in Pattern st.
With B, work 30 rows in St st.
With A, work 10 rows in Pattern st.
With B, work 20 rows in St st.
With A, work 6 rows in Pattern st. Bind off in pattern.
Step: 4
FINISHING
Side Edges
With right side facing and A, pick up and knit 194 sts evenly along one long edge. Work in Pattern st. for 10 rows. Bind off in pattern. Repeat along opposite long edge. Weave in ends.